2013 System Overview

The system for TowerLights 2013 has been revamped again from the system that was used for TowerLights 2012. While we're still coordinating with ITS to use the wiring, we have automated the system so that once it is set up inside, we can run everything remotely from outside of the building.

2012 System Overview

The system for TowerLights 2012 is almost a complete redesign from the system used for TowerLights 2010. This year we're coordinating with ITS to use the existing ethernet wiring to send signals to each room. This should significantly reduce the complexity, time, and intrusiveness of the system setup, at the expense of somewhat greater complexity and cost in the up-front design and fabrication.

More Coming Soon...

We'll fill this section with more specifics as we get the final design nailed down. In the meantime, interested parties are free to view our (somewhat rough) Design Documents and Project Discussions.